Taraz, Jambyl Region · In project development
Altyn Dala
Integrated Cattle & Sheep Farm, Processing and Energy Complex
- 30 hectares
- EU standard
- Zero-waste model
Concept visualisation
From farm to European standard, on one integrated site
Fully integrated production chain
Every process from animal housing to the finished, processed product on a single site.
Zero waste, closed loop
The by-product of each process is the input of the next: manure, offal, wastewater and slaughter by-products become energy and organic fertiliser.
Designed to EU standards
Hygiene, animal welfare and traceability are built into the system from the start.
Energy self-sufficient
Solar and biogas generation allow the site to run largely independently of the grid.
The complex in figures
- hectares total site
- 30
- hectares total site
- cattle + sheep slaughter capacity per day
- 150 + 750
- cattle + sheep slaughter capacity per day
- integrated production and energy units
- 10
- integrated production and energy units
- t/year organic waste converted
- 41,000
- t/year organic waste converted
- GWh/year clean energy (electricity + heat)
- 10.4
- GWh/year clean energy (electricity + heat)
- circular waste management
- 100%
- circular waste management
Land use across 30 hectares
Hover over or tap an area to see its size and share of the site.
Barns + loafing area
11.2 ha
37.2% · 30.1 ha total
Modern barns to EU standards
- Naturally ventilated housing with open loafing areas
- Space per animal in line with EU welfare norms
- Deep-bedding system and thermal comfort
- Natural daylight for a low-stress environment
11.2 hectares of housing and loafing area

Concept visualisation24/7 automation
Robotic feeding, sensor-based herd monitoring and automatic bedding and manure removal keep the site running around the clock, with minimal manual handling and low stress for the animals.
Concept visualisationUninterrupted operation
Automation and energy systems run day and night. The site is designed for zero downtime.
Digital herd management: real-time monitoring and traceability
- Live tracking of herd health and performance data
- On-site digital decision support
- Full traceability record from herd to finished product
- The traceability infrastructure required for exports to the EU
A closed loop: every by-product feeds the next process
Resource, not waste. Every by-product on site becomes energy, fertiliser and, in turn, feed.
Zero waste
- Barns
- Slaughter and processing
- Manure and by-products
- Biogas plant
- Electricity and heat+ solar energy
- Organic fertiliser
- Silage and feed
A site that generates its own energy
Solar and biogas together cover the site’s energy needs; surplus electricity can go to the grid.
Concept visualisationSolar field
The 3.3-hectare solar field is designed to cover a large share of the site’s electricity demand.
- Installed capacity
- 3 MWp
- Annual output
- 4,500 MWh
- Specific yield
- 1,500 kWh/kWp
- Panel area
- 3.3 ha
Concept visualisationBiogas and organic fertiliser plant
A closed-loop system that turns animal and processing waste into electricity, heat and organic fertiliser.
- Organic waste processed
- 41,000 t/year
- Biogas produced
- 1.2 million m³/year
- CHP output
- 400 kWe / 450 kWth
- Electricity
- 2,760 MWh/year
- Heat recovered
- 3,100 MWh/year
- Organic fertiliser
- 37,000 t/year
Total clean energy
Combined, solar and biogas cover the site’s own demand and can supply the surplus to the grid.
- Total clean energy
- 10.4 GWh/year
- of which electricity
- 7.26 GWh/year
- Surplus available to the grid
- 5.4 GWh/year
- CO₂ avoided
- 5,400 t/year
Concept visualisation
State incentives
Livestock, food processing and renewable energy are among Kazakhstan’s priority investment areas. We assess the project’s eligibility for tax exemptions, in-kind grants and financing support together with the investor.
See incentivesProject management
This project is an investment in an EU-standard integrated agricultural and energy complex in Kazakhstan, being developed by TOO Hofmann Invest & Industrial Technologies. Site planning, capacity design and the circular energy model were prepared by the company’s project development team.
Request the investment dossier
The detailed project presentation, virtual tour videos and additional visuals are sent to investors who complete the form.
- Investment amount and ownership structure
- Payback period and financial projections
- Project stage and timeline
- Virtual tour videos and further materials

